Reference – Hammer drilling

Paldiski port, Estonia 2022

Ø914mm steel casing pipe was installed by hammer drilling into limestone for 500 mm gaspipe landfall to new LNG terminal at Paldiski port in Estonia.

TV interview was made on site: