Horizontal directional drilling of transfer sewer Moisio-Kulju
Building sewage drain (PEH 2xØ400mm) and waterpipe (PEH Ø315mm) by horizontal directional drilling and connections, welding, etc. connected to project. Work completely finished as total contract.

